• Home
  • Landowners
    • What we are looking for?
    • Fact Checker
    • The benefits
  • Investors and Offtakers
  • Live projects
    • Worset
    • Middleroad
    • Gately Moor
  • About solar
    • Operation of a Solar Farm
    • Construction of a Solar Farm
    • Decommissioning
  • Our team
  • Contact
Novergy
  • Home
  • Landowners
    • What we are looking for?
    • Fact Checker
    • The benefits
  • Investors and Offtakers
  • Live projects
    • Worset
    • Middleroad
    • Gately Moor
  • About solar
    • Operation of a Solar Farm
    • Construction of a Solar Farm
    • Decommissioning
  • Our team
  • Contact

What makes a good site?

  • Freehold sites which can be available to lease on 6-12 months’ notice
  • Grade 3, 4 or 5 land
  • Parcels of land of 75 acres or more
  • Close to potential points of grid connection including substations or power lines owned by DNOs or NGET (33kV, 66kV or 132 kV)
  • Away from housing
  • Outside SSSIs, AONBs or National Parks
  • Not built on and not shaded by nearby structures or trees

​Other factors could impact on the cost of development and will therefore potentially affect the rent offered. These include:

  • Levels of planting required to screen views and public rights of way
  • Irregular shaped or separate areas of land
  • Bedrock
  • Sloping sites
  • Poor access
  • Proximity to railway lines
  • Wayleaves and other rights across the site
  • Poor GSM signal
Proudly powered by Weebly
  • Home
  • Landowners
    • What we are looking for?
    • Fact Checker
    • The benefits
  • Investors and Offtakers
  • Live projects
    • Worset
    • Middleroad
    • Gately Moor
  • About solar
    • Operation of a Solar Farm
    • Construction of a Solar Farm
    • Decommissioning
  • Our team
  • Contact